Left: Lower Floor Module being prepared to support Main Floor Module.
|
|
 |
|
Left: Column support and bracing for Chalet.
|
|
 |
|
Left: Truck bringing first Main Floor Module to Site.
|
|
 |
|
Left: First Main Floor Module being hoisted by crane.
|
|
 |
|
Left: First Floor Main Module in place.
|
|
 |
|
Left: 12:20pm. Both floors are assembled.
|
|
 |
|
Left: First Roof Module being craned into place.
|
|
 |
|
Below: From this on September 20, 2004...
|
 |
|
Below: ...to this on November 20, 2004. Second Roof Module
gliding into place - ready for a walk through.
|
 |
|
Please arrange for a visit to 20738 Eidelweiss Drive,
Hemlock Valley.
|
|