Lower Floor Module at Hemlock Valley

Left: Lower Floor Module being prepared to support Main Floor Module.

Column support and bracing

Left: Column support and bracing for Chalet.

Truck brings Main Floor Module

Left: Truck bringing first Main Floor Module to Site.

Main Floor Module hoisted by crane

Left: First Main Floor Module being hoisted by crane.

Hemlock Main Floor Module in place

Left: First Floor Main Module in place.

Both floors assembled by noon

Left: 12:20pm. Both floors are assembled.

Hemlock roof module being craned into place

Left: First Roof Module being craned into place.

Below: From this on September 20, 2004...
Hemlock Valley - September 20, 2004

Below: ...to this on November 20, 2004. Second Roof Module gliding into place - ready for a walk through.
Hemlock Valley - November 20, 2004

Hemlock Job Site Sign

Please arrange for a visit to 20738 Eidelweiss Drive, Hemlock Valley.