On Site:
|
|

Above and Right: Preparing the retaining wall with the geogrid and welding
to prepare concrete columns reinforced with rebar.
|
|
 |
|

The columns and crossbracing completed.
|
|
 |
|
In the Factory:
|
Left: Truck moving main floor module.
|
|
 |
Below Left: Truck has air cushions that life module up; then the air is released and module settles down onto cribs.
|
Below Right: Open rafters and gable window that will be seen from the Great Room.
|