Architecton Home Page

Amazing Vacation Home: Hemlock Valley - Early November

[Sept]   |   [Oct]   |   early Nov   |   [late Nov]   |   [Exterior]   |   [Interior]

On Site:

Hemlock site preparation
Above and Right: Preparing the retaining wall with the geogrid and welding to prepare concrete columns reinforced with rebar.

Welding for columns at Hemlock

Columns and Crossbracing for Chalet
The columns and crossbracing completed.

In the Factory:

Hemlock Main Floor Module on truck

Left: Truck moving main floor module.

Below Left: Truck has air cushions that life module up; then the air is released and module settles down onto cribs. Module sits on air cushions on the truck Below Right: Open rafters and gable window that will be seen from the Great Room.

Hemlock rafters and gable window

[Sept]   |   [Oct]   |   early Nov   |   [late Nov]   |   [Exterior]   |   [Interior]

 

Site Design ©2003-2005 Spotted Web Inc. | Hosting by Tsunami.ca